EIA Reports
“BMM” AD
EIA report of “Gold Ore Extraction and Processing in Krumovgrad Mine and Gold Production”
BROSS Holding
EIA report of “industrial park Silistra”
“Valves – GP” OOD
EIA report of “Installation for decomposition and utilization of worked off photographer’s solution and plates from X-ray laboratories of Hospitals and Diagnostics centres located in territory of Republic of Bulgaria
Geotechmin AD
EIA report of “Wind generators park”
Golf club Ibyr AD
EIA report of “Golf club Ibyr, Dolna banya”
Elacite Copper AD
EIA report of “Wind generators park”
Monbat AD
EIA report of “Instalation for batteries production and installation for waste batteries recycling”
“Petromaxx Refinery-Bulgaria” LTD
EIA report of “Silistra small oil refinery”
Sviloza Ltd
EIA report of “Depot for municipal waste, building, industrial and dangerous wastes”
Sviloza AD
EIA report of “E-beam technology for waste gas cleaning from Power plant Sviloza”
”Sviloza yarn” OOD
Information for assessment of EIA necessity of investment proposal “Capacity extend of Installation for artificial silk ZIK from 6000 to 8000 t/yr
Sport complex Kutina EAD
EIA report of “Golf club, Kutina”
Chelopech maining EAD
Information concerning assessment of necessity of EIA report of investment proposal “Decline gallery in Chelopech mine from surface to elevation 450”
Chelopech maining EAD
EIA report of “Expansion of the Processing of Copper and Gold Ore from the Chelopech Deposits in Annual Quantities of up to 3 Million Tons, and Production of Metals from Concentrates



